Sunday, February 25, 2018

54 65 73 317 | Russia’s defense ministry to sign contract for 12 Su-57 fighter jets, February 8, 2018


Russia’s defense ministry plans to sign a contract for a preproduction batch of fifth-generation Su-57 fighter jets, reported by the Russian Deputy Defense Minister, Yuri Borisov.

According to Borisov, the first two planes of this batch may come into service in 2019. He said that ten out of 12 previously manufactured jets are undergoing flight tests.

In the ALW Kabbalah cipher, Komsomolsk-on-Amur, Khabarovsk Krai, RU sums to 317.
317 is the 66th prime number
The new engine has been given no name so far and is conventionally referred to as "stage-two engine."


Seems as though Syria is the 'current' testing ground for the military of this world.
Those poor Syrian people. I've meet a few and they are some of the most nicest people in the world.
Damn shame this is happening in their country.
Su-57 fighter jets are the incoming latest edition to the Russian military defense.


 Komsomolsk-on-Amur is a city in Khabarovsk Krai, Russia, located on the left bank of the Amur River in the Russian Far East.


On December 5, it made the first flight with a new engine. Currently, the plane is equipped with the so-called stage-on engine 117C.
From the date that the first flight was made with the new engine to the day that the Russia’s defense ministry to sign contract for 12 Su-57 fighter jets (2/8/18) is a span of 65 days.
The new engine has been given no name so far and is conventionally referred to as "stage-two engine."
It is also a span of 9 weeks and 2 days, like 92.


Yuriy Ivanovich Borisov is the Russian Deputy Minister of Defence.
Yuriy Borisov is also the a general of the army and serves the Armed Forces of the Russian Federation.


 From Yuriy Borisov's birthday (12/31/18) to the date Russia’s defense ministry to signed a contract for 12 Su-57 fighter jets (2/8/18) is a span of 5 weeks and 4 days, like 54.
 Jesuit Order = 54

The experimental design work on the most advanced fighter jet should be completed in 2019 and its deliveries to the troops should begin at that time.

No comments:

Post a Comment